What should a bathroom renovation scope include?
Record the existing room, demolition limits, layout, trade work, substrates and wet-area assembly, fixtures, finishes, protection, access, hidden-condition process, inspections where applicable and closeout evidence.
What changes when the bathroom is in a condo?
Building-specific bylaws, alteration forms, common-property questions, water shutdowns, elevator and loading, working hours, notices, route protection, records and approvals may need to join the room scope.
Why does moving a fixture affect the proposal?
A move may change drain and vent routes, supply, structure or assemblies, electrical and ventilation work, clearances, building systems and approval questions. Feasibility requires property-specific review.
What waterproofing evidence should be requested?
Ask how wet zones, substrate, system data, seams, corners, transitions, drains, penetrations, compatible products, tests or inspections where applicable, photos and care information will be recorded.
Which Burnaby permits apply?
Requirements depend on the actual property and work. Prepare the existing and proposed scope, then confirm the current plumbing, electrical, building or other routes with the appropriate authority and strata documents.
How should two bathroom quotes be compared?
Use the same room record and compare demolition, rough-ins, assemblies, fixtures, finishes, allowances, owner items, permits and inspections, building logistics, changes, schedule assumptions, payment milestones and closeout.